Back

S$ 1,650,000
S$ 596 psfEst. mortgage S$ 5,908/mo
Factory / Workshop (B2) for Sale in Food Xchange @ Admiralty
2,770 sqft
Bare unit
Admiralty StreetView on map
Sembawang / Yishun (D27)Est. mortgage S$ 5,908/mo
Property details
Property type
Factory / Workshop (B2)
Floor area
2,770 sqft
Price/sqft
S$ 595.67 psf
Condition
Bare unit
Tenanted
Yes until 30 Apr 2026
Last updated
1 hr ago
Ceiling height
6.0 meters
Floor loading
5.0 kN/m^2
Electricity
3 Phase
Electricity supply
60 amps (41.57 kVA)
Aircon
exclude
Amenities
Kitchen
Loading bay
Bath room
Description
Industrial UnitHigh CeilingLoading BayCentral KitchenMezzanine FloorFood FactoryDrive-In AccessRamp Up
Keys on Hand! Viewing can be arrange with short notice.
Suitable for AVA, NEA, HACCP Approval. Fitted with exhaust, can be use for food processing, central kitchen. Office at mezzanine floor.
Ramp up. Loading bay at door step. 10 meter wide drive way.
Managing your day-to-day operations is a breeze at FoodXchange with building facilities ideally suited for manufacturing:
– Ramp-up facility on every level for greater convenience
– Exclusive loading/unloading area for each unit
– Excellent loading capacity of 12.5-15KN/sq metres
– High floor-to-floor height of 7 metres
– 10 metre-wide driveway
– Efficient unit layouts with maximum space utilisation
– Modular unit design for varying scales of operation and flexibility of future expansion
– In-house canteen
Building on Ascendas’ reputation for quality standards, FoodXchange @Admiralty offers companies a well-planned and well-managed business environment conducive for food operations. It features designs, construction and maintenance systems that meet the stringent requirements and specifications of the Hazard Analysis Critical Control Point (HACCP) system.
Enjoy quick start-up and minimise fit-out costs with in-built HACCP-compliant features:
Separate entry and exit points for raw and finished goods
Self-contained units with en-suite washrooms
Mezzanine floor separating office and production areas, with choice of front- or side-mezzanine
Dedicated kitchen exhaust shaft
Waterproffing of all production spaces
Proper drainage and waste management control systems
Well-ventillated unit
By continuing, you agree to 99.co's Terms and Conditions & Privacy Policy.